| |
- OPERATOR'S AND AVIATION
UNIT MAINTENANCE MANUAL - TEST SET, COUNTERMEASURES SET
TS-36151/ALQ-136(V)
- WARNING
- WARNING (cont)
- FIRST AID
- REPORTING ERRORS AND
RECOMMENDING IMPROVEMENTS
- Table of Contents
- HOW TO USE THIS MANUAL
- TEST SET, COUNTERMEASURES
SET TS-3615/ALQ-136(V) (BENCH TEST SET)
- Chapter 1. INTRODUCTION
- SCOPE
- HAND RECEIPT (-HR) MANUAL
- DESTRUCTION OF ARMY
ELECTRONICS MATERIEL TO PREVENT ENEMY USE
- LIST OF ABBREVIATIONS
- Section II. EQUIPMENT
DESCRIPTION
- LOCATION AND DESCRIPTION OF
MAJOR COMPONENTS
- Front Cover
- Front Cover (cont)
- EQUIPMENT DATA
- SAFETY, CARE, AND HANDLING
- Section III. TECHNICAL
PRINCIPLES OF OPERATION
- BLOCK DIAGRAM DESCRIPTION
- FIGURE
- Chapter 2. OPERATING
INSTRUCTIONS
- BTS CABINET AND CONTROL
PANEL ASSEMBLY 1A1
- TABLE 2-1. CONNECTOR PANEL
- CONTROL PANEL ASSEMBLY,
CONTROLS AND INDICATORS
- TABLE 2-2. CONTROL PANEL
ASSEMBLY CONTROLS, INDICATORS, AND CONNECTORS
- TABLE 2-2. CONTROL PANEL
ASSEMBLY CONTROLS, INDICATORS, AND CONNECTORS (cont)
- STATUS PANEL ASSEMBLY 1A2
- TABLE 2-3. STATUS PANEL
ASSEMBLY CONTROLS, INDICATORS AND CONNECTORS
- LEFT HALF OF STATUS PANEL
ASSEMBLY, CONTROLS AND INDICATORS
- TABLE 2-3. STATUS PANEL
ASSEMBLY CONTROLS, INDICATORS AND CONNECTORS (cont)
- RIGHT HALF OF STATUS PANEL
ASSEMBLY, CONTROLS AND INDICATORS
- RF MODULATION ASSEMBLY
1A3/1A4
- TABLE 2-4. RF MODULATION
ASSEMBLY CONTROLS, INDICATORS AND CONNECTORS
- TABLE 2-4. RF MODULATION
ASSEMBLY CONTROLS, INDICATORS AND CONNECTORS (cont)
- Section II. OPERATION UNDER
USUAL CONDITIONS
- PRELIMINARY BTS STARTING
PROCEDURE
- PRELIMINARY BTS STARTING
PROCEDURE (CONT)
- INITIAL ADJUSTMENT
- OPERATING PROCEDURE
- BTS SHUT-DOWN
- Section III. OPERATION
UNDER UNUSUAL CONDITIONS
- TUBEAXIAL FAN FAILURE
- Chapter 3. MAINTENANCE
INSTRUCTIONS
- Section II. SERVICE UPON
RECEIPT
- UNPACKING THE BTS
- INSTALLATION INSTRUCTIONS
- FIGURE
- CONNECTIONS
- TABLE 3-1. CABLING/HOSE
ATTACHMENT TO BTS CONNECTOR PANEL
- Section III. PREVENTIVE
MAINTENANCE CHECKS AND SERVICES
- Section V. MAINTENANCE
PROCEDURES
- Section VI. PREPARATION FOR
STORAGE OR SHIPMENT
- Appendix A. REFERENCES
- REFERENCES (Continued)
- Appendix B. MAINTENANCE
ALLOCATION
- MAINTENANCE ALLOCATION
CHART (Continued)
- USE OF THE MAINTENANCE
ALLOCATION CHART (SECTION II)
- MAINTENANCE FUNCTIONS
- GROUP NUMBER AND
COMPONENT/ASSEMBLY (COLUMNS 1 AND 2, RESPECTIVELY)
- Section II. Maintenance
Allocation Chart
- Section II. Maintenance
Allocation Chart (cont)
- Section III. TOOL AND TEST
EQUIPMENT REQUIREMENTS
- Section IV. REMARKS
- Appendix C. COMPONENTS OF
END ITEM LIST
- SECTION II COMPONENTS OF
END ITEM
- SECTION II COMPONENTS OF
END ITEM (Continued)
- SECTION II COMPONENTS OF
END ITEM (Continued)
- SECTION II COMPONENTS OF
END ITEM (Continued)
- SECTION II COMPONENTS OF
END ITEM (Continued)
- Appendix E. EXPENDABLE
SUPPLIES AND MATERIALS LIST
- Section II. EXPENDABLE
SUPPLIES AND MATERIALS
- INDEX
- INDEX (Continued)
- INDEX (Continued)
- Use of Metric Measuring
System
- Recommended Changes to
Equipment Technical Publications
- Recommended Changes to
Equipment Technical Publications
- Blank Page
- TM-11-6625-2884-12
- Recommended Changes to
Equipment Technical Publications
- Recommended Changes to
Equipment Technical Publications
- Recommended Changes to
Equipment Technical Publications
- By Order of the Secretaries
of the Army and the Navy
- Blank Page
- Recommended Changes to
Equipment Technical Publications
- Recommended Changes to
Equipment Technical Publications
- Blank Page
- Blank Page
- Blank Page
- Recommended Changes to
Equipment Technical Publications
- Blank Page
|
|