Click here to make tpub.com your Home Page

Page Title: INSTALLATION INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2884-1 2/NAVAIR 16-35TS3615-1
INSTALLATION INSTRUCTIONS
3-6.  The  followi ng paragraphs describe bench requirements, cable, air duct
connections, and ac power requirements of the BTS. Use a bench at least 30 x
72 inches, capabl e of supporting weight of 500 pounds.
WARNING
Hiqh voltaqe is used in the operation of this
equipment. Avoid contacting high-voltage con-
nections when installing or operating this equip-
ment.  Injury or death may result if personnel
fail to observe safety precautions.
CAUTION
Top cover must be open to exhaust cooling air
whenever BTS is in operation.  Blower hose must
be securely connected from CM set to BTS whenever
CM set is tested.
CONNECTIONS
3-7.  On top of BTS, using flat blade screwdriver loosen five captive screws
and open hinged cover to front of set; on upper left side of BTS loosen five
captive screws and open cover downward, exposing air hose plenum and cable
connections.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business