|
|
TM 11-6625-2884-12/ NAVAIR 16-35TS3615-1
SECTION VI
PREPARATION FOR STORAGE OR SHIPMENT
PACKING BTS
The BTS is normally shipped in its own combination case.
WARNING
A minimum of four persons must be used in handl-
ing or lifting the Test Set, Countermeasures Set
TS-3615/ALQ-136(V).
Extreme care must be used
in handling, to prevent injury to persons or
damage to equipment.
To prepare the BTS for storage or movement:
Shut it down in accordance with paragraph 2-13.
a.
b.
Disconnect cables and air hose from the side connector panel (para 3-7).
c. Secure cover plates on side connector and top blower panels.
d. Pack all associated manuals, cables, and accessories in the BTS front
cover (page 1-8).
Close and fasten front and rear covers; the BTS is now ready for move-
e.
ment.
PLACING BTS BACK IN SERVICE
3-14.
To place the BTS back in service after storage or movement:
WARNING
A minimum of four persons must be used in handling
or lifting the BTS. Extreme care must be used to
prevent injury to persons or damage to equipment.
a. Press the air relief valve on the side of the case and remove front
cover.
b.
Remove cables, accessories, and technical manuals from the cover.
c. Loosen fasteners and open cover plates from side connector panel and top
blower panel (see para 3-7).
d. Connect test cables and air duct to the side connector panel in
accordance with paragraph 3-7; the BTS is now ready for use.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |