Click here to make tpub.com your Home Page

Page Title: PRELIMINARY BTS STARTING PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2884-12/NAVAIR 16-35TS3615-1
PRELIMINARY
BTS
STARTING
PROCEDURE
2-9.  Energize/deenergize the bench test set ac power only by the 115 VAC 60
Hz, 1 POWER circuit breaker, on the front of CONTROL PANEL ASSEMBLY 1A1.
NOTE
Circuit breakers, designated 115V AC, on the front of the CONTROL
PANEL ASSEMBLY, STATUS PANEL ASSEMBLY, and on each RF MODULATION
ASSEMBLY, are pushbuttons (push to reset on). When the breaker is
off, a button protrudes from its housing displaying a white side
surface. When the circuit breaker is in an energized position,
the button remains depressed in its housing, concealing the side
surface. Thus, a visible white side surface on the button shows
the breaker is off.  These circuit breakers are not to be used as
on/off switches.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business