TM 11-6625-2884-12/NAVAIR 16-35TS3615-1
PRELIMINARY BTS STARTING PROCEDURE (Continued)
c. Check that the POWER indicator on the CONTROL PANEL ASSEMBLY, STATUS
PANEL ASSEMBLY, and on each (1A3/1A4) RF MODULATION ASSEMBLY lights. If the
POWER indicator lights for each of the four assemblies, the required 115 V
power is present. If any of the four assembly indicators do not light, check
that the respective 115 VAC circuit breaker is energized.
INITIAL ADJUSTMENT
2-10. Refer to the appropriate UUT test procedures for initial settings of the
BTS. Normally, no adjustment is required prior to operation.
|