Click here to make tpub.com your Home Page

Page Title: INITIAL ADJUSTMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2884-12/NAVAIR 16-35TS3615-1
PRELIMINARY BTS STARTING PROCEDURE (Continued)
c. Check that the POWER indicator on the CONTROL PANEL ASSEMBLY, STATUS
PANEL ASSEMBLY, and on each (1A3/1A4) RF MODULATION ASSEMBLY lights.  If the
POWER indicator lights for each of the four assemblies, the required 115 V
power is present.  If any of the four assembly indicators do not light, check
that the respective 115 VAC circuit breaker is energized.
INITIAL ADJUSTMENT
2-10.  Refer to the appropriate UUT test procedures for initial settings of the
BTS.  Normally, no adjustment is required prior to operation.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business