|
|
TM 11-6625-2884-12/NAVAIR 16-35TS3615-1
SECTION II
SERVICE UPON RECEIPT
SECTION CONTENTS
PAGE
UNPACKING
CHECKING UNPACKED EQUIPMENT
INSTALLATION INSTRUCTIONS
CONNECTIONS
POWER REQUIREMENTS
CHECKOUT
UNPACKING
3-4. The BTS is normally shipped in its own combination case. Cables and
accessories are stored inside the front cover. Keep them there when they
are not in use.
To unpack BTS:
OPEN FRONT COVER STORAGE LID
PRESS PRESSURE RELEASE BUTTON
OPEN FRONT COVER LATCHES
OPEN TOP COVER FRONTWARD
OPEN SIDE COVER DOWNWARD
REMOVE FRONT COVER AND PLACE IT
HORIZONTAL
CHECKING UNPACKED EQUIPMENT
3-5.
Check unpacked equipment as follows:
a. Inspect the equipment for damage incurred during shipment. If the
equipment has been damaged, report the damage as described in chapter 1.
b. Check that the equipment is complete as listed on the packing slip.
Report all discrepancies as described in Chapter 1.
c. Check whether the equipment has been modified. Equipment which has
been modified will have the MWO number on the side panel, near the nomenclature
plate. Also check whether all currently applicable MWO'S have been applied.
(Current MWO's applicable to the equipment are listed in DA Pam 310-1. )
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |