Click here to make tpub.com your Home Page

Page Title: Section II. SERVICE UPON RECEIPT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2884-12/NAVAIR 16-35TS3615-1
SECTION II
SERVICE UPON RECEIPT
SECTION CONTENTS
PAGE
UNPACKING
CHECKING UNPACKED EQUIPMENT
INSTALLATION INSTRUCTIONS
CONNECTIONS
POWER REQUIREMENTS
CHECKOUT
UNPACKING
3-4.  The BTS is normally shipped in its own combination case.  Cables and
accessories are stored inside the front cover.  Keep them there when they
are not in use.
To unpack BTS:
OPEN FRONT COVER STORAGE LID
PRESS PRESSURE RELEASE BUTTON
OPEN FRONT COVER LATCHES
OPEN TOP COVER FRONTWARD
OPEN SIDE COVER DOWNWARD
REMOVE FRONT COVER AND PLACE IT
HORIZONTAL
CHECKING UNPACKED EQUIPMENT
3-5.
Check unpacked equipment as follows:
a.  Inspect the equipment for damage incurred during shipment. If the
equipment has been damaged, report the damage as described in chapter 1.
b.  Check that the equipment is complete as listed on the packing slip.
Report all discrepancies as described in Chapter 1.
c.  Check whether the equipment has been modified. Equipment which has
been modified will have the MWO number on the side panel, near the nomenclature
plate.  Also check whether all currently applicable MWO'S have been applied.
(Current MWO's applicable to the equipment are listed in DA Pam 310-1. )

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business