Figure 7-2. "Zeroing" the AN/URM-1O5 meter.
Figure 7-4. "Zeroing" the Simpson 160 meter.

Test Set, Electrical (Load Bank,) 0-30 Kw, Ac; Portable Skid-Mounted Page Navigation
  45    46    47    48    49  50  51    52    53    54    55  
img
. .
TM 5-6625-2691-13&P
Figure 7-3. "Zeroing" the TS-352B/U meter.
NOTE
If the needle will not "zero", replace the batteries. If
the needle still will not "zero" after replacing the bat-
teries, turn the meter in for repair.
7-3