Figure 7-3. "Zeroing" the TS-352B/U meter.
Figure 7-5. TS-352 continuity test.

Test Set, Electrical (Load Bank,) 0-30 Kw, Ac; Portable Skid-Mounted Page Navigation
  46    47    48    49    50  51  52    53    54    55    56  
img
. . . . . .
TM 5-6625-2691-13&P
Figure 7-4. "Zeroing" the Simpson 160 meter.
or 7-4).
NOTE
NOTE
If the needle will not "zero", replace the batteries. If
Failure to do the following steps can damage the
the needle still will not "zero" after replacing the bat-
multimeter.
teries, turn the meter in for repair.
(2) Disconnect the circuit being tested.
b. Continuity Tests. Continuity tests are made to
(3) Connect the meter probes to both terminals of
check for breaks in a circuit (such as the switch, light
the circuit being tested. (The TS-352B/U is illustrated
bulb, or electrical cable (fig. 7-5),) To make a continuity
(fig. 7-5), but the probes are connected to the circuit the
check, do the following steps:
same way with all three multimeters.)
(1) Set up and "zero" the multimeter (figs. 7-2,7-3
7-4