Figure 5-2. Test Set, Louver Removal
Figure 5-3. Wind Switch Replacement

Test Set, Electrical (0-33Kw Load Bank) Model 1057 Page Navigation
  18    19    20    21    22  23  24    25    26    27    28  
img
. . . .
TM5-6625-2694-13&P
Section
IV.
MAINTENANCE
OF
POWER
ABSORBER
5-6.
Wind
Switch
(Figure
5-3).
a.
Inspect
b.
Test
c.
Replace
INITIAL
SET-UP
Personnel
Required:
MOS
52D10
Tools
and
Equipment:
Equipment
Condition:
Power
Off
Electrical
Repair
Kit
(4940-00-294-9517)
REMARKS
ACTION
ITEM
LOCATION
INSPECT
Inspect
For:
1.
Wind
Switch
(1)
Damaged  Components
Frayed  or  Damaged  Wire
Replace
Switch
TEST
Terminals
24
Test
for
continuity
2.
TB1,  TB2
between  terminals,
&
25
or  TB3  On
switch
activated
Air
Inlet
Side
REPLACE
3.
Wind
a.  Six  Nuts(5),
Remove
Two  Lock  Wash-
Switch
(1)
ers(4),
Eight
Flat
Washers(3)
Two  Screws(2)
b.
Switch
Remove
and
Replace
Cut
Wires
Elements(6)
Install
&
Tighten
Splice
By
c.  Two  Screws
(2),
Eight
Flat
Crimping
Butt
Washers(3),
Two
Splice
Lock  Washers(4)
Six  Nuts(5)
Refer
to
Chapter
2.
4.
Perform
Operational
Check.