Table 5-1. Direct Support Troubleshooting - Continued
Table 5-1. Direct Support Troubleshooting - Continued

Test Set, Electrical (0-33Kw Load Bank) Model 1057 Page Navigation
  14    15    16    17    18  19  20    21    22    23    24  
img
. .
TM5-6625-2694-13&P
Table 5-1.
Direct Support Troubleshooting (cont'd)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Step
3
Check Contactor Relay K4.
3 (+);
Measure voltage across terminals 1 (-) to
should be 24 VDC.
terminals 5 (+)
to 4 (-);
b.
Measure voltage across
should be 0 VDC.
and  replace Contactor
Refer
to paragraph
5-13
c.
if measurement across
terminal 1 to terminal 3
Relay
4  to
and  measurement
terminal
across
is  24  VDC
terminal 5 is NOT 0 VDC.
4.
PARTIAL LOAD APPLIED TO GENERATOR.
Step 1.
Check Contractors K1 and K2.
terminal
and
Measure
a.
voltage across terminal X1
X2 of each contactor.
Should read 24 VDC.
applied  to  terminals
X1  and  X2,
b.
With 24 VDC
input terminals of
Contactor to
measure voltage from
to LO.
terminals  of  Contactor
LO and from  output
Measurements should be equal.
and replace  Contactor if
Refer to paragraph 5-12
c.
measurements  from input and  output terminals to LO are
NOT equal.