Equipment Data.
Section II. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)

Test Set, Electrical (0-33Kw Load Bank) Model 1057 Page Navigation
  1    2    3    4  5  6    7    8    9    10  
img
. . . .
TM5-6625-2694-13&P
CHAPTER
2
OPERATING
INSTRUCTIONS
Section
I.
DESCRIPTION
AND
USE
OF
OPERATOR'S
CONTROLS
AND
INDICATORS
Figure
2-1.
General.
2-1
shows
the
controls
will
need
to
you
operate
the
Test
Set.
Figure
2-1.
Operator
Control
Panel
KEY
FUNCTION
CONTROL
1
Input
Terminals
Connect
Generator
Output
To  Test
Set
Selects
Test
Set
For
Hi
2
Hi-Lo
Selector
Or
Lo
Voltage
Input
Master
Switch
Applies  Power  From
3
Generator  to  Test  Set
4
Load
Selector
Applies  0-30
KW  Load  To
Generator  In
3  KW  or  6  KW
Steps
5
Variable
Selector
Applies  0-3  KW
Load
To  Generator.
2-1