• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2-1. Operator Control Panel
Table 2-1. Operator Preventative Maintenance Checks and Services

Test Set, Electrical (0-33Kw Load Bank) Model 1057 Page Navigation
  1    2    3    4    5  6  7    8    9    10    11  
img
. . .
TM5-6625-2694-13&P
II. O P E R A T O R
PREVENTIVE
MAINTENANCE
Section
CHECKS
AND
SERVICES
(PMCS)
Even
though
the
Test
Set
has
been
designed
to
include
2-2.
General.
and
protective
features,
periodic
inspection
must
be
certain
safety
that  any  defects  will  be  discovered  and  corrected  before
performed  so
in  serious  damage.
they
result
When  performing  your  Before  Operation
mind  the
If
your
always  keep  in
CAUTIONS  and  WARNINGS.
(B)
PMCS,
with
proper
equipment.
fails
to
operate,
troubleshoot
equipment
Report
any
deficiencies
using
the
proper
forms,
see
TM
38-750.
Preventative
Maintenance
Checks
and
Services.
Refer
2-3.
Operator
to  Table  2-1  for  Operator  PMCS.
numbered
in
Item
Number  Column.
are
a.
Checks  and  services
This
column  will  be  used
chronological
order
regardless
of
interval.
item
numbers
for
t h e  "TM  Item  Number"
column  on  DA
as  a  source  of
Form  2404  in  recording  results  on  PMCS.
Interval
Columns.
The
column
b.
headed  by  B
will
contain  a  dot
be
performed
it
is
to
check
indicating
opposite  the
appropriate
Before
Operation.
To  Be
Inspected
items  listed  in
The
this
Item
Column.
c.
and
identify
the
items
to
be
are
divided
into
groups
column
inspected.
This  column
d.
Procedures
Column.
contains
a
brief
description
of
the  procedure  by
which  the  check  is  to
be  performed.
If  Column.
Equipment
Will
Be
Reported  Not  Ready/Available
e.
This  column
will
contain
the
criteria
which
will
cause
the  equipment
because
of
inability
to
to
be
classified
as  Not  Ready/Available
perform  its  primary  mission.
2-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.