Section III. OPERATION UNDER USUAL CONDITIONS
Section IV. OPERATION UNDER UNUSUAL CONDITIONS

Test Set, Electrical (0-33Kw Load Bank) Model 1057 Page Navigation
  4    5    6    7    8  9  10    11    12    13    14  
img
. .
TM5-6625-2694-13&P
Brass
link
is
NOT
installed
during
3
phase
operation.
Injury
to
personnel
or
damage
to
equipment
may
result.
(b)
On
a
three-phase,
3-wire
connection,
the
input
wires
to
L1,
L2
and
L3
without
are
connected
concern
for
polarity
or
phase
sequence.
LO
is
not
used.
( 4 )T u r n
Master
Switch
(4)
ON
and
desired
apply
Load
S w i t c h e s (5).
Figure
2-2.
Test
Set,
Electrical
Change
1
2-5