• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section II. TROUBLESHOOTING
Section III. MAINTENANCE PROCEDURES

Test Set, Electrical (0-33Kw Load Bank) Model 1057 Page Navigation
  7    8    9    10    11  12  13    14    15    16    17  
img
. .
TM5-6625-2694-13&P
Table
3-1.
Operator
Troubleshooting
MALFUNCTION
TEST
OR
INSPECTION
CORRECTIVE
ACTION
1.
Test
Set
fails
to
start.
Check
for
proper
input
connections
(1).
Step
1.
Connect
properly.
Inspect
for
proper
voltage
selection
(2).
Step
2.
Connect
Voltage
Selector
(2)
to
correct
receptacle.
Step
3.
Check
master
circuit
breaker
(3).
Place
master
circuit
breaker
to  "ON"
position.
Test
Set
starts
but
presents
no
load
to
generator.
2.
Inspect
load
switches
(4)
for
proper
selection.
Step
1.
Switch
on
proper
load
switches.
Step
2.
Check
wind
switches
(6)
for
proper
operation.
Free  wind  vane.
Step
3.
Inspect
air
intake
louver
(5)
for
obstructions.
Clean
louver.
Master
On
Switch
1.
Power  Input  Terminals
3.
Load
Switches
Voltage
Selector
Plug
4.
Change
1
3-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.