Click here to make tpub.com your Home Page

Page Title: AIR TEMP C Switch S6 Wiring Check
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4931-378-13&P
(5) Set AIR TEMP Co switch S6 (25) to each
J4 Pin
J4 Pin
S10 Position
S10 Position
of the following positions and read the
Ps
20
28
LAI +15V
specified resistance for each position. Use
-
37
22
LAI -15V
4-wire measuring techniques. (See table
5V
18
12
5-4, 12 or 13.)
INJV
52
2
+15V
29
14
DVM Reading (ohms)
S6 Position
38
8
-15V
38
-15V
16
373.40 to 375.00
54
400.25 to 401.85
40
Connect DVM between TP7 (14, figure
(3)
419.32 to 420.92
-30
2-1) and TP8 (13).
447.82 to 449.42
-15
(4)
Set OUTPUT SEL 2 switch S10 (12) to
476.22 to 477.82
0
LAI +15V.
15
504.52 to 506.12
Read 48.6 to 53.6 ohms on DVM. (See
(5)
30
532.62 to 534.22
table 5-4, 8 or 9.)
45
560.62 to 562.22
Set OUTPUT SEL 2 switch S10 (12) to
(6)
60
588.52 to 590.12
LAI -15V.
71
608.92 to 610.52
(7)
Read 48.6 to 53.6 ohms on DVM. (See
f. OUTPUT SEL 1 Switch S9 Wiring Check. C h e c k
table 5-4, 10 or 11.)
switch S9 and associated wiring by performing the
Connect DVM positive lead to TP8 (13).
(8)
following procedures:
Set OUTPUT SEL 2 switch S10 (12) to
(9)
(1) Connect DVM negative lead to TP1 (20).
each of the following positions and read
( 2 ) Set OUTPUT SEL 1 switch S9 (21) to
continuity to the designated pin of con-
each of the following positions and read
nector J4 (36). (Pin pattern for J4 is
continuity to the designated pin of con-
shown in figure 5-6.) (See table 5-4, 7.)
nector J4 (36). Figure 5-6 shows the pin
pattern of J4. (See table 5-4, 14.)
J4 Pin
J4 Pin
S10 Position
S10 Position
J4 Pin
J4 Pin
S9 Position
S9 Position
Ps
19
27
LAI +15V
DTR
47
ANLG IN
6
-
19
27
L A I -15V
DR
ANLG OUT
7
56
27
5V
13
REF OSC
DATA
46
49
27
INJV
3
ATS
4
61
CLK
27
+15V
21
27
-15V
9
negative lead from TPI (20,
(3) Move DV
figure 2-1j to TP3 (18).
23
( 4 ) Set OUTPUT SEL 1 switch S9 (21) to
o
e. AIR TEMP C Switch S6 Wiring Check. C h e c k
each of the following positions and read
switch S6 and associated wiring by performing the
continuity to the designated pin of con-
following procedures:
nector J4 (36). Figure 5-6 shows the pin
pattern of J4. (See table 5-4, 14.)
Note
J4 Pin
J4 Pin
S9 Position
S9 Position
ATS
DR
62
10
The DVM specified in Appendix D, Sec-
DTR
48
65
CLK
tion Ill shall be used with 4-wire mea-
DATA
53
suring techniques to avoid unwarranted
equipment rejection.
(5) Move DVM negative lead from TP3 (18,
figure 2-1) to TP5 (16).
( 6 ) Set OUTPUT SEL 1 switch S9 (21) to
(1) Install CCA 1A3.
each of the following positions and read
(2) Connect DVM positive lead to TP1 (20).
continuity to the designated pin of con-
(3) Connect DVM negative lead to TP3 (18).
nector J4 (36). Figure 5-6 shows the pin
( 4 ) Set OUTPUT SEL 1 switch S9 (21) to
pattern of J4. (See table 5-4, 14.)
ATS.
5-10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business