Click here to make tpub.com your Home Page

Page Title: Table 5-4. Troubleshooting
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4931-378-13&P
(47 ) Carefully adjust
resolver B2 (2) for
Voltage recorded in step (37) shall be
(39)
maximum positive dc voltage. Record
within 0.136 Vdc of the voltage recorded
voltage.
in step {29) multiplied by 0.440. (See ta-
(48)  Dual-speed drive shall indicate between
ble 5-4, 74.)
359.9 and 0.0O. (See table 5-4, 75.)
(40) Set AADS TEST switch S16 (30) to SIN
(49)  Voltage recorded in step (47) shall be
within 0.136 Vdc of the voltage recorded
(41) Set
resolver B2 (2) to 90.0.
in step (29) multiplied by 0.440. (See
resolver B2 (2) for
(42) Carefully adjust
maximum positive dc voltage. Record
Set circuit breakers CB1 (47) and CB2
(50)
voltage. (See table 5-4, 73 and 76.)
(46) to OFF.
(43)  Dual-speed drive shall indicate between
(51)
Disconnect power cables W1 and W2
89.9 and 90.1o. (See table 5-4, 75.)
from facility power.
Voltage recorded in step (42) shall be
(44)
Disconnect power cables from test set.
(52)
within 0.136 Vdc of the voltage recorded
Remove test cable.
(53)
in step (29) multiplied by 0.440. (See ta-
ble 5-4, 74.)
5.13. Troubleshooting. Table 5-4 lists corrective actions in
Set AADS TEST switch S16 (30) to COS
checkout procedure order. A malfunction is identified, a
(45)
corrective action is stated and direction is given for disposi-
resolver B2 (2) to 0.0O.
Set
tion.
(46)
Table 5-4. Troubleshooting
Malfunction
Test or Inspection
Corrective Action
NOTE
This table lists malfunctions in the order
they are met in the checkout procedure.
Refer to Chapter 6 Section II for com-
ponent removal and Section V for instal-
lation. If any malfunction continues after
all listed corrective actions have been
taken, send the test set to higher mainte-
nance for repair.
Failure isolation shop set will help identify
failed circuit card assemblies.
1. OPEN CIRCUIT BETWEEN TP4 AND J4-59 WITH S2 SET TO CPU TEST.
Step 1. Check witch S2.
Replace switch S2.
Step 2. Perform continuity check of wiring to S2. (See paragraph 5-14 and figure F0-1.)
Repair wiring as necessary
2. SHORT CIRCUIT BETWEEN TP4 AND J4-59 WITH S2 SET TO OFF (DOWN) POSITION.
Step 1. Check witch S2.
Replace switch S2.
3. OPEN CIRCUIT BETWEEN TP4 AND J4-60 WITH S3 SET TO LAI FLR,
Step 1. Check switch S3.
Replace switch S3.
Step 2. Perform continuity check of wiring to S3, (See paragraph 5-14 and figure FO-1.)
Repair wiring as necessary.
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business