-6-
The fluid should be even with the plates which are marked,
"Fluid Level" located at each end of the sump.
(g) Open Vi., V2, V3, V4 and v6.
(a) Connect calibrating manifold to gauges G1 to A1, G2
to A2 , G3 to A3 and supply line to S.
(See Figure 5).
(b) Connect connector P3, cable W3 to receptacle J3,
(See Figure 5).
connect connector P4, cable W4 to receptacle J4.
(c) Set T2 to approximately 70.
(d) Place flow meter switch at VOLT ADJ position.
(e) Place S1, S2 in OFF position and S3 at START.
(f) Connect power cable W1 to 120V 60 Hz power supply
(g) Place S1 in ON position and S3 in position 1. Turn
flow meter adj. knob until needle coincides with V. ADJ line on
meter, then set flow meter knob in FMI position.
(h) Set S3 at position 2.
Adjust T2 until M2 & M3 read
0.35 amps each.
Ml should read approx. 10 volts.
(i) Set S3 at position 3.
Adjust R2 until M2 reads 0.70 amps.
Adjust R3 until M3 reads 0.70 amps.
(j) Set S3 at position 4.
(k) Set S3 at position 1.
(1) Set S2 (Pump Switch) at ON.
(m) Adjust V5 until Gl, G2, and G3 read 320 3 psi.
The flow meter must read in the Green Area,
(n) Set S2 at OFF.
|