|
|
TM 55-4920-415-13&P
CHAPTER 3
AVIATION UNIT MAINTENANCE INSTRUCTIONS
SECTION I. PREPARATION FOR INSTALLATION, STORAGE AND SHIPMENT
3-1. Unpacking Unit . Remove wood box from around
3-3. Preparation of Unit for Shipment . In addition to
the gyro tester being careful not to damage unit.
following the steps in paragraph 3-2, secure the gyro
tester in a wood crate. Preservation, packaging, and
3-2. Preparation of Unit for Storage.
marking requirements for shipment must be in
a. Position the fork (7) in the vertical position and
accordance with the instructions contained in Figure 4-1.
the gimbal ring (6) in a plane parallel to the
ground.
b. Wrap the gyro tester in a moisture barrier
material (Item 1, Table 1-1).
SECTION II. INSPECTION AND SERVICING OF NEW EQUIPMENT
3-6. Lubrication.
3-4. Inspection Requirements.
a. Table 3-1 contains instructions on the types of
lubricants that are satisfactory depending upon
a. Follow the before-operation services given in
the temperatures and on the intervals for
replacement.
b. Perform a complete visual inspection of the
gyro tester for broken wires, corroded terminals
and cracked or loose parts.
for operation.
Table 3-1: Lubrication Chart
Expected Temperatures
Intervals
-50to +40F
Above +32F
GO-LUBRICANT, Gear Universal
GOS-LUBRICANT, Gear Universal
Sub-zero Gear housing
GO 90
GOS
1 year
GAA-GREASE, Automotive and artillery
Drive motor bearings
All temperatures
1 year
3-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |