• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Variable Transformer.
Rectifier Bridge.

Test Set, Electrical (0-33Kw Load Bank) Model 1057 Page Navigation
  34    35    36    37    38  39  40    41    42    43    44  
img
. . . .
TM5-6625-2694-13&P
5-18.
Voltage
Sensor.
Replace
INITIAL
SET-UP
Personnel
Required:
MOS
52D10
Tools
and
Equipment:
Equipment
Condition:
Power
Off
Electrical
Repair
Tool
Kit
Housing
Removed
(Para.
5-11)
(4940-00-294-9517)
ITEM
ACTION
LOCATION
REPLACE
Disconnect
and
Tag
Wires
Sensor(1)
a.  Four  Nuts(2),  Four  Lock
Washers(8),
Four
Flat
Washers(9),  Four  Wires(3)
b .  TW O  N u t s ( 7 )  r T
Lock
Remove
WO
Washers(6),  Two
Flat
Washers(5),  Two
Screws(4)
Remove
and
Replace
c.
Sensor(1)
Install
and
Tighten
d.  Two  Screws(4),  Two  Flat
Washers(5),  Two  Lock
Washers(6),  Two  Nuts(7)
Remove
Tags
and
Connect
e.  Four  Wires(3),  Four
Flat  Washers(9),  Four  Lock
Washers(8),
Four
Nuts(2)
Install
(Para.
5-11)
f.
Housing
5-27


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.