• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5-2. Housing, removal and installation.
Figure 6-4. Rectifier, removal and installation.

Test Set, Electrical (Load Bank,) 0-30 Kw, Ac; Portable Skid-Mounted Page Navigation
  34    35    36    37    38  39  40    41    42    43    44  
img
. . . . .
TM 5-6625-2691-13&P
Figure 5-3. Wind switch removal and installation.
The combined output capacity of the rectifier is 6
5-9. Rectifier
AMPS DC with air flow of 300 LFPM (Linear Feet per
WARNING
Minute). Unit is especially designed to withstand in
Do not breathe fumes of burning
--
rush of three fan motors.
selenium rectifier. Fumes are toxic
b. Removal. Refer to figure 5-4 and remove the rec-
and dangerous.
tifier.
a. General. The selenium rectifier stack is an assem-
c. Installation. Refer to figure 5-4 and install the rec-
bly of twelve, triple density selenium single plate cells
tifier.
connected to form two three-phase full-wave bridges.
5-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.