Section VIII. MAINTENANCE OF THE POWER ABSORBER
Figure 4-7. Terminal studs, removal and installation.

Test Set, Electrical (Load Bank,) 0-30 Kw, Ac; Portable Skid-Mounted Page Navigation
  28    29    30    31    32  33  34    35    36    37    38  
img
. . . . .
TM 5-6625-2691-13&P
Figure 4-4. Wind switch location
4-24. Toggle Switch
4-25. Rectifier
WARNING
a. Testing. Test the toggle switches for continuity
Very toxic fumes of selenium dioxide
using a multimeter (para 7-2). Replace a defective
are given off when selenium coated
switch.
b. Removal. Remove the toggle switches by removing
plates burn. Do not breathe the fumes.
Keep fumes and compound away from
all mounting hardware.
the skin. Handle the burned plates
c. Installation. Install the toggle switches by replac-
with gloves and dispose.
ing all mounting hardware.
4-9