Click here to make tpub.com your Home Page

Page Title: Section II. ORGANIZATIONAL (SECOND ECHELON) MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Section II. ORGANIZATIONAL (SECOND ECHELON) MAINTENANCE
equipment and includes the inspection, testing,
18.5. Scope of Second Echelon Maintenance
and repair or replacement of parts, subassemblies,
The maintenance duties assigned to second
or units that inspection and tests indicate would
echelon maintenance personnel of the equipment
probably fail before the next scheduled periodic
are listed below, together with a reference to the
Preventive maintenance checks and
service.
paragraphs covering the specific maintenance
services of the equipment at the second echelon
functions.
level are made at monthly and quarterly intervals
a. Monthly preventive maintenance checks and
at the same time as the daily (par. 18.2) and weekly
services (par. 18.9).
(par. 18.3) checks and services unless otherwise
b. Quarterly preventive maintenance checks
directed by the commanding officer.
and services (par. 18.11).
b. Maintenance forms and records to be used
and maintained on this equipment are specified in
18.6. Tools, Materials, and Test Equipment
TM 38-750.
Required
18.8. Monthly Maintenance
In addition to the tools and materials listed in
paragraph 17, the following items are required.
Perform the maintenance functions indicated in
a. Tool Kit, Radio Repairman TK115/G.
the monthly preventive maintenance checks and
b. Sandpaper (No. 000).
services chart (par. 18.9) once each month. A
c. Friction tape (FSN 5970-296-3305).
month is defined as approximately 30 calendar
d. Rubber tape (FSN 5970-296-1175).
days of 8-hour-per-day operation. If the equip-
e. Multimeter AN/URM-105.
ment is operated 16 hours a day, monthly preven-
tive maintenance checks and services should be
18.7. Second Echelon Preventive Mainte-
performed at 15-day intervals. Adjustment of the
nance
maintenance interval must be made to compensate
for any unusual operating conditions. Equipment
a. Second echelon preventive maintenance is
maintained in a standby condition must have
the systematic care, inspection, and servicing of
monthly preventive maintenance checks and
equipment to maintain it in serviceable condition,
services performed on it. Equipment in limited
prevent breakdowns, and assure maximum opera-
tional capability.  Preventive maintenance is the
storage does not require monthly preventive main-
nance.
responsibility of all echelons concerned with the
18.9. Monthly Preventive Maintenance Checks and Services Chart
services and must be performed concurrently. All
18.10. Quarterly Maintenance
deficiencies or shortcomings will be recorded in
Quarterly preventive maintenance checks and
accordance with the requirements of TM 38-750.
services on the equipment are required. Periodic
Perform all the checks and services listed in the
daily (par. 18.2), weekly (par. 18.3), and monthly
quarterly preventive maintenance checks and
(par. 18.9) checks and services constitute a part of
the quarterly preventive maintenance checks and
services chart (par. 18.11) in the sequence listed.
3
AGO 6942A

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business