TM 11-6625-2975-40
2-41 .
REWIRING TEST SET FOR 230 VAC OPERATION. (CONT)
NOTE
The test set is factory wired for 115 vac operation. The following procedure converts the
test set to 230 vac operation, Both configurations are covered here.
1.
Remove six screws (1) and remove power supply cover (2).
2.
Remove one screw (3), Iockwasher (4), and flat washer (5).
3.
Move barrier strip (6) down and out of way.
4.
Rewire for 230 vac or 115 vac operation as shown In detail A. Retain Jumper wire.
CAUTION
Make sure all screws on terminal board are tight.
5.
Move barrier strip (6) Into position and Install one screw (3), lockwasher (4), and flat
washer (5).
If 230 vac operation is selected, remove A5F1 fuse from fuseholder and replace with a 2-amp,
6.
250 vac fuse,
7.
Remove two screws (7) and turn NOTICE plate (8) to display operation selected.
Position power supply cover (2) on power supply and install six screws (1).
8.
FOLLOW-ON MAINTENANCE: Install dust cover (para 2-28).
2-67
|