|
|
-8-
SHUT DOWN PROCEDURE
(a) Set S3 at start position
(b) Set S2 and S1 in off position.
(c) Close and fasten the control drawer and the cover.
(d) If the test stand is to be transported to another
the hydraulic fluid should be drained from the system
location,
and V1 and V6 closed,
and hold down brackets installed.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |