Click here to make tpub.com your Home Page

Page Title: SHUT DOWN PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

-8-
SHUT DOWN PROCEDURE
(a) Set S3 at start position
(b) Set S2 and S1 in off position.
(c) Close and fasten the control drawer and the cover.
(d) If the test stand is to be transported to another
the hydraulic fluid should be drained from the system
location,
and V1 and V6 closed,
and hold down brackets installed.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business