Table 2-1. Input Connections
Figure 2-4. Stopping instructions

Test Set, Electrical (Load Bank,) 0-30 Kw, Ac; Portable Skid-Mounted Page Navigation
  11    12    13    14    15  16  17    18    19    20    21  
img
. . . .
TM 5-6625-2691-13&P
OPERATING INSTRUCTIONS
STARTING
1. OPEN BOTH SIDE DOORS.
2. CONNECT VOLTAGE PLUG TO DESIRED VOLTAGE RECEPTACLE.
3. WITH INPUT POWER "OFF" *CONNECT INPUT POWER LEADS TO
POWER TERMINALS AND GROUND TERMINAL.
4. TURN VOLTAGE SELECTOR SWITCH TO DESIRED POSITION.
5. CHECK VOLTAGE PLUG AND POWER TERMINAL CONNECTIONS
TO CORRESPOND WITH INPUT VOLTAGE AND PHASING.
6. TURN "ON" INPUT POWER.
7. TURN "ON" MASTER SWITCH, FANS SHOULD OPERATE.
8. OPERATE LOAD SWITCHES FOR DESIRED LOAD.
TS 025328
Figure 2-3. Starting instructions.
2-7. Stopping the Equipment
Refer to figure 2-4 and stop the test set.