• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVAL AND INSTALLATION PROCEDURES
REMOVAL AND INSTALLATION PROCEDURES - Continued

Maintenance Manual For Control Unit, Alarm Set C-9412/Fss-9(V) -9 Page Navigation
  29    30    31    32    33  34  35    36    37    38    39  
J2.  Align notch on P2 with J2 and
t. To install new connector P2/J2, position
connect P2 to J2.  Lock metal tabs
J2 on inner enclosure mounting bracket
together and tighten collar on connector
and install hex nut. Position collar and
P2.
metal tab on wire. Solder wires on P2/
5-29


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.