• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section IV. REPLACEMENT OF WORN PARTS
Figure 14. Replacing pump chamber and low-pressure plunger packing.

Test Set, Flame Thrower-Riot Control Age Disperser, Hydrostatic And Volumetric, 6,000 Psi, M5
Page Navigation
  18    19    20    21    22  23  24    25    26    27    28  
img
Figure 13. Replacing pressure release control lever preformed packing.
sert the pin through the holes in the
formed packing (9/16- by 13/16- by
pump lever socket and link. Install
1/8-in.) inside  t h e l o w p r e s s u r e
plunger at the threaded end of the
the cotter pin to fasten the pin in
place.
plunger. Position the pull-back spring
(3) P a c k i n g gland and low pressure
and spring shield over the upper end
plunger packing. Install a new pre-
of the pump chamber.  Screw the
packing gland retainer into the low
f o r m e d packing (1- by l- by
1/8-in.) in the groove on the outside
pressure plunger about three turns.
Insert the high pressure plunger into
of the low-pressure plunger casing.
Insert the low pressure plunger in the
the low pressure plunger. Screw the
packing gland retainer in the low
pump chamber.  Screw the up-stop
pressure plunger until it bottoms. In-
bushing into the pump chamber until
25
AGO
8359A


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.