Click here to make tpub.com your Home Page

Page Title: Section II. GENERAL SUPPORT REPAIR PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6760-238-34
Section II. GENERAL SUPPORT REPAIR PROCEDURES
(steps (1) through (3) above).
4-5. General
WARNING
WARNING
When making repairs or adjustments, be
Before beginning any work with these
extremely careful of the ac line voltage.
chemicals, be sure to check with the
Always disconnect the power source
local  Safety  Office  or  Preventive
from  the  equipment  when  making
Medicine Activity. They can inform you
repairs.
of any special precautions (handling,
4-6. General Support Disassembly/Assembly
storage, accidental contact with, etc.) to
take to avoid any health hazards.
Procedures (FO-6)
NOTE
Most of the assemblies, subassemblies, and parts in the
General support maintenance includes
shutter test set can be reached easily and replace
all repair operations covered in lower
without the use of special tools When replacing part the
level manuals and lower level portions of
general techniques and precautions in paragraph 3-11
this manual as well as those covered in
and 3-12 apply.
this chapter.
a.  Epoxy Coating.  After any maintenance has
a. Removal of Test Panel Assembly.  Refer to
been performed that requires removal of the surface
paragraph 3-8a for removal of test panel assembly.
coating on test board and components assemblies, the
Removal  of  SHUTTER  MECHANISM
b.
exposed areas must be recoated for fungus and
Connector J3.
moisture protection using the following procedure.
NOTE
WARNING
The following instructions will apply for
Xylol is toxic and flammable, use it only
the removal and replacement of RELAY
in small quantities m a well ventilated
ASSY
connector
J1,
SHUTTER
area.  Do not breathe vapors or allow
connector  J5,  CONTROL  PANEL
liquid to contact the skin. Do not use in
connector  J6  and  BRIDGE  ASSY
the presence of open flame or sparks.
connector J7.
(1) Part A (Resin). Measure 100 parts by
(1) Unsolder and tag all wires attached to
weight of Araldite 571 CX (manufactured by Ciba Co.,
SHUTTER MECHANISM connector J3( ).
Fair Lawn, NJ) with 29 parts by weight of Beetle 216-8
(2)
Remove  four  screws  (1),  four
(manufactured by American Cyanamid Co.) and stir well.
flatwashers (2), four nuts (3), and remove SHUTTER
Mix 27 parts by weight of Diacetone Alcohol (Federal
MECHANISM connector J3 (4) from rear of test panel
Specification O-D-306) and stir well. Store in separate
(10).
container.
c. Replacement of SHUTTER MECHANISM Con-
(2) Parts B (Hardener). Measure 100 parts
nector J3.
by weight of Araldite 820 (manufactured by Ciba Co.,
(1)
Position  SHUTTER  MECHANISM
Fair Lawn, NJ) with 37.5 parts by weight of Xylol (Federal
connector J3 (4) in test panel (10) and secure with
Specification TT-X-916) and stir well. Mix 20 parts by
hardware removed in step b(2) above.
weight of Butyl Alcohol (Federal Specification TT-B-846)
(2) Replace and solder all wires removed in
and stir well Store m separate contamer.
step b(1) above.
b.  To Prepare Epoxy for Immediate Use.  To
d. Removal of POWER Connector J2.
prepare the epoxy for immediate use, mix two parts "A"
(1)  Remove two top screws (20), two
(Resin) with one part "B" (hardener) in a quantity that can
flatwashers (2), two nuts (3), and remove component
be used in eight hours.  Mix thoroughly.  Brush the
assembly (19) away from test panel (10).
mixture onto the areas to be coated, making sure to
(2) Unsolder and tag all wires attached to
avoid areas that require mechanical movement such as
POWER connector J2 (5).
control adjustments and wafer switch contacts.
(3)  Remove  bottom  two  screws  (1),
(1) The epoxy mixture will dry to the touch in
flatwashers (2), nuts (3), and remove POWER connector
approximately 1 hour when applied in a film of 0.005 to
J5 (5) from test panel (10).
0.010 inch thickness.  Total curing time requires 24
e. Replacement of POWER Connector J2.
hours at room temperature.
Curing time can be
(1)  Position POWER connector J2 (5) in
shortened by heating in a circulating oven at 1500 F for
test panel (10) and secure with hardware removed in
hours.
step d(3) above.
(2) If necessary to spray Epoxy coating, thin
(2) Replace and solder all wires removed in
wit Xylol (Federal Specification TT-X-916).
step d(2) above.
(3) Mask over terminals on both sides of
(3) Position component assembly (19) on
printed circuit boards before applying Epoxy coating
POWER
4-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business