Click here to make tpub.com your Home Page

Page Title: Chapter 5. Shipment and Limited Storage and Demolition to Prevent enemy Use
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

material and seal with pressure-sensi-
20. Preparation for Shipment or Limited Storage
tive tape.
a. Disconnect all test leads from the resolver
(2) Overwrap the packaged equipment
test set filter, and all additional equipment used
tightly in corrugated fiberboard and
in the test procedure.
seal with gummed paper tape.
b. Coil the cables neatly, and tie each coiled
(3) Coil the cable attached to the filter,
cable with cotton twine.
and tie it with twine. Place the filter
in the middle of the coil, wrap the
21. Repackaging for Shipment or LImited Storage
unit in waterproof barrier material,
The exact procedure for repackaging Test
seal with pressure-sensitive tape, and
Set, Resolver AN/ASM-101 depends upon the
place padding around the unit.
materials available and the conditions under
(4) Overwrap the packaged filter tightly
which the equipment is to be shipped or stored.
in corrugated fiberboard and seal with
Whenever possible, adapt the procedures out-
gummed tape.
lined in a and b below. The informtion con-
cerning the original packaging (par. 8) will
(5) Wrap the coiled test and interconnect-
also be helpful.
ing cables together in corrugated fi-
berboard and seal with gummed pa-
a. Materials Required. The materials and the
per tape.
approximate quantities of each required for re-
packaging Test Set Resolver AN/ASM-101 are
(6) Wrap the technical manuals in water-
listed in the chart below. For stock numbers of
proof barrier material, and seal with
materials, refer to SB 38-100.
pressure-sensitive tape.
(7) Place the packaged resolver test set,
filter, and cables in the fiberboard box
and place the packaged technical man-
uals within the box.
(8) Fill all remaining space within the
box with filler material and pads of
fiberboard to prevent all movement
within the box.
(9) Fold down the flaps of the fiberboard
box and seal all seams and closures
with pressure-sensitive tape.
b. Packaging.
(10) Mark the outside of the fiberboard
(1) Pad the front panel of the resolver
box as prescribed in MIL-STD 129B
test set with filler material, and then
a n d pertinent instructions in the
wrap the unit in waterproof barrier
movement directive.