TM 11-6625-2937-13
b. Test Setup. Set up the equipment as shown
unit (fig. 5-3).
in figure 5-1.
c. Adjustment Procedure.
(3) Connect three-phase power (115 V ac, 400
The following
Hz) to control-interface unit via power cable assembly
procedure should be performed whenever power supply
WI.
A1PSI (7, fig. 5-3) is replaced, or when the power supply
(4) Connect multimeter to measure + 5 V
voltage is determined to be out of tolerance. Perform the
between power supply terminals AIPSI-3(+) and AIPSI-
procedure with the power supply installed in the control-
4(-).
interface unit.
(5) Set rear panel circuit breaker CBI to on Cm).
(6) Set front panel POWER ON/OFF switch to
WARNING
ON.
Be careful when 115 V ac is applied to the
(7) Set MODE SELECT switch to POWER OFF.
equipment. Serious injury or DEATH may
(8) Adjust power supply output voltage
result from contact with terminals carrying
adjustment (ADJ POT) for +5.0 O0.I V.
this voltage.
(9) Set POWER ON/OFF switch to OFF.
(1) On control-interface unit, set rear panel
(10)Remove multimeter from control-interface
circuit breaker CBI to off (out).
unit.
(2) Remove top access cover from control-
(11)Replace top access cover.
interface
(12)Disconnect three-phase power cable WI
from control-interface unit.
5-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |