|
|
T M 55-4920-430-13
VOLTAGE
DIGITAL
MEASUREMENT
CONTROL/SWITCH
STEP
NOMENCLATURE
POSITION
TEST PROCEDURES
NO.
NORMAL RESULTS
( a ) TIME DELAY- (a) 4.000
(7)
(a) None
(a)
None
SEC switch S9
(b) CYCLIC BRAKE (b) 1
(b) J3-PP (+) to
(b) +6.888 to +7.112Vdc
switch S31
J3-AA
HOLD indicator
comes on after 5 to
7 seconds
(c) CYCLIC BRAKE (c) 0
(c)
(c) None
None
switch S31
( a ) AC/DC VOLT- (a) 60, 2,
(8)
(a)
(a) None
None
METER SELECT A,0
Switches
(b) RESPONSE
( b ) REMOVE (b) None
None
(b)
TEST STIM
switch S8
(c) RESPONSE
(c)
(c) O N
(c) None
None
TEST MODE
then
switch S7
OFF
(d) METER
(d) None
(d) DC
None
(d)
switch S5
(e) 20V
(e) RANGE
(e) AC/DC VOLT-
(e) Connect decade
switch S6
METER reads
resistor set to 1
+6.92 to +7.08
megohm from
Vdc
J3-PP to J2-52
NOT E
Resistor remains connected until step 52.
(a) ON
(a) RESPONSE
(a) None
(9)
(a)
None
TEST MODE
switch S8
(b) RANGE switch (b) 200MV
(b) None
(b) AC/DC VOLT-
S6
METER reads
-0.01 to + 0 . 0 1
Vdc.
4-61
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |