Click here to make tpub.com your Home Page

Page Title: Shutdown Procedures.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-430-13
Procedures
Equipment Is
Item
Interval
Item  to
be
Check for and have repaired
Not Ready/
No.
Inspected
BDA
or adjusted as necessary
Available If:
Operation is not
Smooth operation from
14
30 left to 30 right
smooth or range
Time
Smooth operation from
15
is not as specified.
delay
0to9
switches
Elapsed
16
Appropriate change since
time
last check.
indicator
Operation is not
17
PITCH ATT
Smooth operation from 0
HSI HDG
smooth or range
(ccw) to 1000 (cw)
control
is not as specified.
POWER ON CHECKS
Requirements
Test set
Perform operational start
18
of check are
and connection (para
not met.
Requirements
Test set
Perform self test
19
of check are
(para 2-6b).
not met.
Test set
Perform shutdown
20
2 - 9 . Shutdown Procedures.
a. Set the LCT POWER switch, the two AFCS POWER switches, and the TESTER POWER switch
to OFF.
b. Set all other test set switches and controls to their initial position as listed in table 2-2.
c. Disconnect the test set cables from the unit under test.
d. Disconnect the power cable W7 from the power source.
2-34

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business