Click here to make tpub.com your Home Page

Page Title: Section III. TROUBLESHOOTING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ARMY TM 5-6675-309-14
MARINE CORPS TM 08840A-14/1
Section III. TROUBLESHOOTING
b. Test Connections. Connect cables only when
8-7. General. Should malfunction of the PSTS be sus-
called for in the test procedures.
pected, perform test procedure in accordance with
table 8-5. The table is arranged in four columns. The
NOTE
first column contains the test operation to be per-
Incorrect connections can cause wrong
formed. The second column contains the normal indica-
indications. See figure 8-4 for electrical
tion to be observed when the procedure has been
connections.
performed. The third column contains the corrective
action to be taken if the normal indication is not
c. Procedure. Perform testing in accordance with
obtained. The fourth column gives the coordinates on
the schematic diagram of the affected circuitry. When
performing corrective actions, refer to the PSTS sche-
matic diagram (figure FO-2) and wire list (table 8-1) to
determine where to make voltage measurements. For J2
Correct digital voltmeter scale must be
and J3 connector-pin locations, see figure 8-3A. See the
selected manually. The digital voltmeter
PSTS arts location diagram (figure 8-5) and exploded
does not change range automatically.
view (figure 8-6) for location of parts. Wherever a
NOTE
corrective action has been taken, the complete test
procedure must be repeated to verify repair. The self-
In the malfunction indication/corrective
test procedure must be followed in the order given.
action column of table 8-5, components
to be replaced are listed in order of most
likely failure. Verify component failure by
8-8. Power Supply Test Set Troubleshooting.
making voltage and resistance checks be-
fore replacement. After a component is
a. Test Equipment and Materials.
replaced, check for normal indication be-
f o r e attempting to replace another
(1) Digital Voltmeter AN/GSM-64B, or equiva-
component.
lent, for all voltage and impedance measure-
Indicators may light at various times
ments.
throughout this test. Unless listed in table
8-5 as a normal indication, disregard the
(2) Stopwatch.
lighted indicator.
If the corrective action does not eliminate
(3) Oscilloscope AN/USM-281A or AN/USM-
the malfunction, then check for parallel
273.
s h o r t i n g paths (e.g., shorted diodes,
shorted relay contacts, etc.)
(4) Multimeter AN/USM-233.