|
|
TM5-6625-2694-13&P
Section
IV.
MAINTENANCE
OF
POWER
ABSORBER
Wind
Switch
a.
Inspect
b.
Test
c.
Replace
INITIAL
SET-UP
Personnel
Required:
MOS
52D10
Tools
and
Equipment:
Equipment
Condition:
Power
Off
Electrical
Repair
Kit
REMARKS
ACTION
ITEM
LOCATION
INSPECT
Inspect
For:
1.
Wind
Switch
(1)
Damaged Components
Frayed or Damaged Wire
Replace
Switch
TEST
Terminals
24
Test
for
2.
TB1, TB2
between terminals,
&
25
or TB3 On
switch
activated
Air
Inlet
Side
REPLACE
3.
Wind
a. Six Nuts(5),
Remove
Two Lock Wash-
Switch
(1)
ers(4),
Eight
Flat
Washers(3)
Two Screws(2)
b.
Switch
Remove
and
Replace
Cut
Wires
Elements(6)
Install
&
Tighten
Splice
By
c. Two Screws
(2),
Eight
Flat
Crimping
Butt
Washers(3),
Two
Splice
Lock Washers(4)
Six Nuts(5)
Refer
to
4.
Perform
Operational
Check.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |