Click here to make tpub.com your Home Page

Page Title: Table 5-1. Direct Support Troubleshooting (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-6625-2694-13&P
Table 5-1.
Direct Support Troubleshooting (cont'd)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Step
3
Check Contactor Relay K4.
3 (+);
Measure voltage across terminals 1 (-) to
should be 24 VDC.
terminals 5 (+)
to 4 (-);
b.
Measure voltage across
should be 0 VDC.
Refer
and  replace Contactor
c.
if measurement across
terminal 1 to terminal 3
4  to
terminal
and  measurement
across
is  24  VDC
terminal 5 is NOT 0 VDC.
4.
PARTIAL LOAD APPLIED TO GENERATOR.
Step 1.
Check Contractors K1 and K2.
terminal
and
Measure
a.
voltage across terminal X1
X2 of each contactor.
Should read 24 VDC.
applied  to  terminals
X1  and  X2,
b.
With 24 VDC
input terminals of
Contactor to
measure voltage from
to LO.
terminals  of  Contactor
LO and from  output
Measurements should be equal.
and replace  Contactor if
c.
measurements  from input and  output terminals to LO are
NOT equal.
5-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business