|
|
TM5-6625-2694-13&P
Section
III.
MAINTENANCE
PROCEDURES
3-4.
General.
Instructions in
this section are
published for
the
information and guidance of tile operator in maintaining the Test Set.
Main
Housing Assembly.
Inspect
exterior
of
housing
for
dents,
cracks or chipped paint.
Air Intake Louver (5).
Check air intake louver for any foreign material
that might impair airflow and clean louver accordingly.
Deleted.
Wind Switches (6).
Manually opera te the airflow vanes to ensure proper
mechanical operation.
Voltage
selector
Plug
(2).
Inspect
the
selector
for
bent
pins,
loose screws or dirt.
5.
Air Intake Louver
6.
Wind Switch
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |