a.
The
operator
must
know
how
to
General.
perform
every
which
the
Test
Set
is
This
gives
operation
of
capable.
section
instructions
on
starting
and
stopping
the Test
Set,
and adjusting
the
Test
Set
to
the
desired
load.
HIGH
VOLTAGE
IS
PRESENT
DEATH
ON
CONTACT
may
result
if
personnel
fail
to
observe
safety
precautions
b.
indicated
in
Preparation
for
Starting.
Perform
the
PMCS
as
Table
2-1.
Make
sure
that
the
top
rear
panel
is
removed
so
that
air
can
be
exhausted
from
the
load
bank.
c.
Starting
(1)
Open
Access
Door
(1).
(2)
Selection
of
high
or
low
voltage
loading
is
made
by
the
appropriate
receptacle.
inserting
Voltage
Selector Plug
(2)
into
This
must
be
considered
for
single
and
three-phase
operation.
(a)
The
Voltage
Selector
Plug
(2)
should
be
inserted
in
operating
with
of
the
following
LO
receptacle
when
the
ratings:
120/208
volts,
three-phase,
4-wire
single-phase
120
volts,
three-phase
3-wire
240
volts,
(b)
The
Voltage
Selector
Plug
(2)
should
be
inserted
in
the
following
HI
receptacle
when
with
of
operating
the
ratings:
240/416
volts,
three-phase,
4-wire
240 volts, single-phase
generator
is
connected
by
way
of
Input
power
from
the
(3)
the
knob-type
terminals
(3) L1, L2, L3
and
LO
on
the
block
located
on
The input wires
should
be
terminated
with
flat
the
control
panel.
lugs
suitable
for
a
3/8
inch
diameter
stud.
two
input
single phase load, the
When
connecting
a
(a)
to L1 and LO,
without concern for polarity.
The
wires
are
connected
installed
between
brass
jumper
link,
stored
on
the
control
panel,
is
L1-L2
and
L2-L3.
2-4 C h a n g e
1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |