Click here to make tpub.com your Home Page

Page Title: Section VIII. MAINTENANCE OF THE POWER ABSORBER
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6625-2691-13&P
b. Repair. Repair by straightening, removing dents
4-20. Handles, Latches, Braces and
or replacing damaged parts.
Brackets
c. Installation. Install by aligning and replacing
a. Removal. Remove by taking off all mounting
mounting hardware.
hardware.
Section VIII. MAINTENANCE OF THE POWER ABSORBER
mounting hardware.
4 - 2 1 . General
b. Inspection. Inspect the fuseholders for cracks,
This section contains instructions for testing the
breaks or other damage.
switches, rectifier, voltage sensing module, contactor,
c. Installation. Install by replacing all mounting
control transformer, filter capacitor and voltage plug.
hardware.
Instructions are also included for the removal and in-
4-23. Wind Switch
stallation of the fuseholders, toggle switch, terminal
Test the wind switch (fig. 4-4) for continuity using a
stud, filter capacitor and the fan.
multimeter (para 7-2). Check for proper operation.
Notify direct support maintenance for replacement ac-
4-22. Fuseholders
tion.
a. Removal. Remove the fuseholder by removing all

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business