TM 5-6350-275-24&P
3-135. FINAL INSPECTION/TEST.
a. General. This section provides final inspection and test procedures to ensure the ICIDS system is functioning
after repair. After satisfactory completion of these inspections/tests, the ICIDS should be functional.
b. Final Inspection.
(1) Check that the power switches on the processing units, monitors, power supplies, and sensor units operate
smoothly.
(2) Check that the circuit breakers on the power supplies operate correctly.
(3) Check cabling for cracked or broken insulation.
(4) Check that all hardware is securely fastened.
(5) Ensure that individual assembly covers are fastened.
c. Final Test.
(2) Upon satisfactory completion of final test, the ICIDS will be functional.
3-250