|
|
TM 11-7010-201-40-5/ET821-AA-MMI-050/E154 MTS/T O 31S5-2TSQ73-2-5
Section V. PERFORMANCE VERIFICATION
5-26. Introduction. The procedure outlined in this section should be followed to ensure that the MTS test aid is
functioning properly.
5-27. Functional Test Procedure. The functional test procedure includes required test equipment, initial conditions,
ohmmeter checks, and main test.
a. Required Test Equipment.
(1) Oscilloscope OS-261/U (NSN 6625-00-127-0079)
(2) Power Supply HP 6268B (NSN 6130-00-249-2748) or equivalent: 5v at 5amps.
(3) Digital Voltmeter AN/USM-451 (NSN 6625-00-168-0585) or equivalent.
NOTE
The HP 6268B power supply requires an operating voltage of 115v + 10%, 60 Hz, single phase.
b. Initial Conditions.
(1) Turn DATA/FUNCTIONAL/CONT switch to FUNCTIONAL.
(2) Set SS switch to up position.
(3) Set BCP switch to up position.
(4) Turn power supply on.
(5) Adjust power supply to + 5.50 + 0.25v (no-load condition).
(6) Turn power supply off.
(7) Connect power supply to MTS test aid binding posts (CAL + 5V and GND).
c. Ohmmeter Checks.
(1) Measure resistance between J01-107 and GND (black binding post); resistance should be less than one ohm.
(2) Set SS switch to down position.
(3) Measure resistance between J01-107 and GND; an open reading should be indicated.
(4) Measure resistance between J0J-109 and GND; resistance should be less than one ohm.
(5) Set BCP switch to down position.
(6) Measure resistance between J0J-109 and GND; an open reading should be indicated.
5-18
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |