|
|
TM 11-7010-201-12/ET821-AA-OMl-010/E154 MTS/TO 31S5-2TSQ73-1
NOTE
The MTS must be prepared for
operation (para 2-3) before you do
in-system card tests.
a. Perform preliminary in-system card test
procedures.
NOTE
Illustrations of the ADP STATUS
AND CONTROL panel and of the
circuit breaker panel in this manual
are of the AN/TYC-39. For more
specific systems information, refer to
TM 11-5805-683-12 (AN/TYC-39)
and to TM 11-5805-681-12 (AN/TTC-
39).
2-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |