Click here to make tpub.com your Home Page

Page Title: Table 4-3. Receptacles
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

C1, TM 11-6625-646-15
d. Turn the FUNCTION switch to AC PWR.
j. When testing the roll channel in SAS amplifier
Observe that the function meter indicates in the green
114E3030-49, perform the following additional tests:
sector.
(1) Turn
the
adapter
ROLL
GYRO
e. Operate  the  rate  table  clockwise  at  the
SIMULATOR switch to R ROLL.
prescribed rate.
Observe the channel feedback
(2) Check the roll channel balance. Refer to
(cancellation) voltage on the associated AXIS meter.
TM 11-1680-201-35.
NOTE
(3) Press and release the HALF-GAIN switch.
When testing the pitch channel in
Observe the ROLL AXIS meter indication at each switch
SAS amplifier 114E3030-49, set the
position.
adapter GAIN SWITCH to GRD during
(4) Turn the ROLL GYRO SIMULATOR
rate table operation.  Observe the
switch to R LIM.  Observe the ROLL AXIS meter
effect on the PITCH AXIS meter
indication.
indication.  Set the switch to AIR
(5) Turn the ROLL GYRO SIMULATOR
after observing the meter indication.
switch to L ROLL. Repeat (2) and (3) above.
f. Operate the rate table counterclockwise at the
(6) Turn the ROLL GYRO SIMULATOR
prescribed rate. Observe the channel feedback voltage
switch to L LIM.  Observe the ROLL AXIS meter
on the associated AXIS meter.
indication.
g. Set the AXES METERS READ switch to OPEN
(7) Turn the ROLL GYRO SIMULATOR
LOOP. Repeat e and f above. Observe the channel
switch to OFF.
output voltages on the AXIS meters.
k. If no further tests are to be performed, stop the
h. Set the AXES METERS READ switch to
test set (para 4-20).
CLOSED LOOP.
i. To check the SAS amplifier half-gain function,
4-9. Airspeed and Sideslip Tests
press and hold the HALF-GAIN switch.  Repeat e
Test the SAS amplifier airspeed and sideslip circuits as
through g above. Observe that the FULL GAIN indicator
follows:
goes out.
Observe that the channel AXIS meter
a. Set the AXES METERS READ switch to OPEN
indication is reduced to the prescribed half-gain
indication. Release the switch.
Table 4-3. Receptacles
Function
115V 400~J62 (28) ........................................... Ac power receptacle. Connects 115-volt 400-cycle ac to test set circuits.
SAS J60 (27) .................................................... Test receptacle. Connects test set circuits to SAS amplifier.
115V 60~J61 (26) ............................................. Ac power receptacle. Connects 115-volt 60-cycle ac to the air pump.
R Air (17).......................................................... Airhose fitting. Connects sideslip pressure to the SAS amplifier R
fitting.
L Air (19) .......................................................... Airhose fitting. Connects sideslip pressure to the SAS amplifier L
fitting.
P Air (22) .......................................................... Airhose fitting. Connects pitot air pressure to the SAS amplifier P
fitting.
S Air (25) .......................................................... Airhose fitting. Connects static air to the SAS amplifier S fitting.
CARD TESTER (30, 31, and 32) ...................... DEM/MOD J70 (32)-Test receptacle for demodulator-modulator cards.
Connects to the test set circuits.
AMPLIFIER J71 (31)-Test. receptacle for amplifier cards. Connects
to the test set circuits.
CALIBRATION J72 (30)-Test receptacle for calibration cards. Con-
nects to the CALIBRATION TEST POINTS (29)-J42 through J59.
MAIN CONNECTOR TEST POINTS ................ Test jacks. Connected to the corresponding pins of the SAS amplifier
(16)-J1 through J41.
receptacle.
31

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business