output level for 7 volts as observed on the ac
13. Preliminary Opertating Procedure
a. Set the resolver test set controls to the
b. Remove the ac Voltmeter connection from
positions listed in the following chart:
the tee connector and reconnect it to the VOLT-
METER connector (2, fig. 5) and adjust the
INPUT LEVEL control for 4.25 volts as ob-
served on the ac voltmeter.
c. Remove the ac voltmeter connection from
the VOLTMETER connector and reconnect it
to the OUTPUT connector (3, fig. 5).
b. Connect the resolver test set and filter
to the equipment to be tested and the additional
d. Set the indicator connected to the rotor
equipment (par. 7) as shown in figure 5. The
of the resolver being zeroed to 300" and unlock
ac voltmeter should be connected to the REF.
the resolver rotor or the resolver stator (de-
pending upon the particular unit being zeroed).
tee connector (1, fig. 5). Be sure the hot lead
of the oscilloscope is connected to the red ter-
Note. Refer to the technical manual covering the
specific unit being zeroed to determine the particular
minal on the filter. Use Cable Assembly, Spe-
control to be used to set the indicator and the specific
cial Purpose, Electrical CX8327/ASM-101 as
winding to be unlocked.
the test cable if the AN/ASN-33 course indi-
e. Alternately adjust the AMP. BAL. con-
cator is being zeroed.  If the AN/ASN-33
trol and the resolver rotor (or stators) of the
course selector is being zeroed, use Cable As-
unit under test to obtain the least possible sig-
sembly, Special Purpose, Electrical CX-8376/
nal amplitude (minimum null ) as observed on
ASM-101 as the test cable. If an equipment
other than the AN/ASN-33 is being zeroed, a
f. After the minimum null has been obtained
suitable test cable must be fabricated (par. 6C).
lock the resolver stator (or rotor) of the unit
c. Connect the test equipment to the power
under test in place.
source.
15. Mopping Procedure
d. Energize all test equipment and allow 15
minutes warmup time.
a. Reenergize the test equipment and discon-
nect the test equipment from the power source.
14. Operating Procedure
b. Disconnect all interconnecting cables, test
a. Adjust the signal generator output fre-
leads, and the tee connector from test equip-
quency to 30 cps and adjust the signal generator
ment and equipment under test.