|
|
9. Checking Unpacked Equipment
a. All test equipment controls face the opera-
tor, and are easily reached from the operator's
a. Inspect the equipment for damage in-
position.
curred during shipment.
b. The operator can easily change connec-
b. Check the equipment against the packing
tions during the test procedure.
list. When no packing list accompanies the
equipment, use the basic issue items list (app.
c. The operator can easily read the ac volt-
III).
meter face, signal generator dial, and oscillo-
c. If the equipment is damaged or does not
scope screen from his position.
check with the packing list, refer to paragraph
near the workbench.
10. Placement of Equipment
Be sure the power source meets
Caution:
Arrange the work area to meet the following
equipment requirements before connecting and
requirements:
energizing the equipment.
8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |