Click here to make tpub.com your Home Page

Page Title: Figure 2-.2 Primary power input connections.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-467-122
Figure 2-.2 Primary power input connections.
a. 115-Volt Operation. Connect the equipment for
(2) Remove the front panel from the cabinet.
115-volt operation as follows:
(3) Connect plug PI to 115V jack J30 on the
(1) fimove the 16 screws around the edge of
rear of the front panel.
the test set that secure the front panel.
(4) Replace the front panel into the cabinet.
(5) Replace the 16 screws.
CAUTION
b. 230-Volt Operation. Connect the equipment for
Remove the panel carefully: the front
230-volt operation as follows:
panel and cabinet are joined by an in-
terconnecting cable.
2-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business