Click here to make tpub.com your Home Page

Page Title: SECTION II. INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-3024-14/EEW-AC-MMA-010/E154 SYSEX/TO 33AA50-5-1-1
SECTION II
INSTALLATION
2-1. INTRODUCTION
5. Open the top access cover to the output con-
This section describes unpacking and installa-
nector panel. To open the access cover, slide the
tion steps required to operate the Exerciser. The
two latches toward the rear of the Exerciser.
Exerciser is a portable instrument designed for
table top operation. No special tools are required
6. Attach the transport signal/control cable P1
for installation.
and P2 (P/N 1000-564) to connectors J1 and J2
of the Exerciser as shown in Figure 2-1. See Fig-
2-2. UNPACKING
ure 3-2 for connector location.
The Exerciser is packed for shipment in ac-
Note
cordance with standard commercial practice for
shipment by air freight, rail, or truck.
Connectors J1 and J2 of the Ex-
erciser are keyed to prevent acci-
The Exerciser is precision-made and care
dental insertion of P1 into J2, or P2
should be taken not to drop it, or subject it to
into J1.
severe handling. Carefully remove the instrument
from the shipping container and check against the
7. Attach the transport power cable P1 (P/N
packing slip for shortages or damages.
1000-566) to connector J3 of the Exerciser as
shown in Figure 2-1.
2-3. PREPARATION FOR USE. (Figure 1-1 )
8. Insert the Exerciser power cable into the
Normal installation consists of setting the Ex-
power socket located at the rear of the Exerciser.
erciser in a horizontal position on a bench, table,
Plug the power cable into 115 Vat, 60 Hz power
or cart. The Exerciser has a built-in blower for
source as shown in Figure 2-1.
internal cooling. Care should be taken to provide
ample ventilation to the instrument.
The following procedures describe preparations
When connecting the AC power
for operating the Exerciser.
cord to the line, be certain that the
round safety grounding pin of the
1. Set the Exerciser on an appropriate bench,
three-prong plug is connected to a
table, or cart in its standing (vertical) position.
good ground source. Do not at-
tempt to operate the Exerciser with
2. Open the bottom access cover to the cable
an adapter that disconnects this
storage compartment. To open the access cover,
safety ground.
slide the two latches down.
Remove the power cable and the two transport
interconnecting cables. Close the access cover.
CAUTION
Do not place objects over the top
3. Set the Exerciser in a horizontal position on
or behind the Exerciser cabinet.
its bottom feet. Fold the carrying handle upward.
Failure to observe this caution will
Release the two side clips to open the front cover
cause obstruction of air flow and
and open the front cover.
overheat the Exerciser. Ensure
that blower fan is operating when
4. Lift the Exerciser by the carrying handle and
system power switch is turned on.
fold the cover back under the Exerciser. Set the
Refer to Section V if blower fan
Exerciser back down on its bottom feet and fold
does not operate.