|
|
TM 11-6625-3023-14/ET904-AA/MMA-010/E154 TS3684/TO 33A1-12-1173-1
CHAPTER 3
OPERATING INSTRUCTIONS
Section I. CONTROLS AND INDICATORS
3-1.
Introduction. This section presents the operating instructions for the test set and includes the functions of all
operating controls and indicators.
3-2.
Controls and Indicators. The test set controls and indicators are shown in figure 3-1 and functionally described
in table 3-1.
Section II. OPERATION
3-3.
Introduction. This section provides the operating procedures for the test set. These procedures consist of the
test set operational check and the operating instructions for checking the performance of the bulk, coaxial and EOW line
ESA devices. Maintenance schedules require that each signal line ESA device be tested upon initial installation prior to
operation of a system that has been relocated and also tested periodically at specific predetermined intervals.
NOTE
The operational procedures described herein apply to the AN/TTC-39 System as well as to
other systems containing electric surge arrestors. See references in Appendix A for specific
details when testing electric surge arrestors in the AN/TTC-39 System.
3-4.
Test Set Operational Check.
a.
Equipment Required. A digital multimeter or equivalent.
WARNING
Test set ground is provided through the third wire of the AC power cord. The test set must
be powered from the system under test or a lethal voltage potential could be developed
between the hardware and the ESA test set case.
b.
Procedure.
(1)
Connect test set power cord into a 115 VAC (50, 60, or 400 Hz) power outlet within the system under
test.
(2)
Turn POWER switch to ON position. The red lamp should light. If it does not, refer to paragraph 5-6.
(3)
Perform lamp test by placing TEST switch in SHORT position and press the two momentary TEST
toggle switches simultaneously. The green lamp should light.
3-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |