Click here to make tpub.com your Home Page

Page Title: ATTEN CONTROL ALINEMENT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2976-40
2-14. VORBEARING SELECTOR CONTROL ALINEMENT. (CONT)
PROCEDURE (CONT)
4. Rotate VOR bearing selector control clockwise, stopping at each control setting. Verify
oscilloscope waveform at each control setting matches appropriate square wave in diagram
above.
2-15. ATTEN CONTROL ALINEMENT.
TEST EQUIPMENT REQUIRED
Dual-Volt Power Supply, HP PS503A
Power Meter, HP 432A with H75-478A
EQUIPMENT SETUP
Connect equipment as indicated in the following diagram.
NOTE
Dual-volt power supply to test set J2 pin connections shown in preliminary procedure
(page 24).
2-57

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business