|
|
TM 11-6625-2975-40
POWER SUPPLY PERFORMANCE TEST. (CONT)
2-14.
Turn power (PWR) on. Allow at least 30 minutes for warmup.
PROCEDURE
1. Use voltmeter to check dc voltages attest points as shown in previous illustration.
2. If measured dc voltages are not within limits, go to troubleshooting chart 2-1, sh 10.
2-16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |