|
|
TM 11-6625-2885-30/NAVAIR 16-35TS3614-2
BTS STARTING PROCEDURE
3-10.
a. Turn on the 28V power source.
Switches may be in any position.
b.
RF Modulator Assembly (1A3) and (1A4).
c. Status Panel 1A2:
All other switches may be in
Set VOLTAGE MONITOR switch (1) to +28V.
any position.
On Control Panel Assembly lA1:
d.
(1) Set POWER 28VDC (2) to ON.
(2) Set POWER 115 VAC 60 Hz 10 (3) to ON.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |